This week dry wall went up! The mud and tape will be started Thursday, and hopefully finished by this weekend so we can start to paint. When we signed up to do painting to save money, we didn't realize that included the ceiling. Soooooo....... we got that going for us.
I have some ideas for the colors. We need to paint the kitchen, dining room, mud room, and bathroom. And ceiling, but only in the kitchen and mud room. We also need to tile the mud room and bathroom. Good thing we have 2.5 weeks until the flooring goes in. And then cabinets!
As for what we have been doing, we have spent the last 10 days getting - the bathroom - vanity, toilet, lights, tile, mirror; the mud room tile; kitchen - lights, oven, microwave, stove, hood, back splash, and finally chose the counter top. I think that is it.
Here are the pictures of walls!
 |
| Bathroom. |
 |
| Amazingly, we were able to keep the stove, sink, and dishwasher through this phase. So we are still able to cook! |
 |
| Pantry is on the left. Door to mud room in the back. |
 |
| Looking toward the family room. |
 |
| This is not what we originally planned. We were going to have this area open with a flat ceiling, but it was too open for Kevin. So we have the sides built, but took out the soffit between them. |
 |
| There is also a wall in the mud room! |
 |
| Looking from the kitchen, through the mud room, into the dining room. |
 |
| This is the new view from the garage into the mud/laundry room. Saturday night Kevin decided he wanted to have doors to block the view of the washer and dryer. We needed to OK from our contractor, so Sunday night he built this! It had to be done by Monday morning to get drywall. |
 |
| Dining room. No change. |